Skip to content

Refubishment Works at Jesus Green Lido

    A newspaper cutting showing men in the 1920s cleaning the lido, which has been emptied of water.

    Please be aware that Jesus Green Lido is now undergoing a comprehensive refurbishment of its toilets and showers. Renovation of the toilets and showers has been high on the list of repairs and the current works means that the women’s & men’s bathrooms, including toilets and showers, will be temporarily closed until the beginning of the school holidays.

    As a temporary solution, portable toilets and temporary cold water showers are available poolside.

    As well as working toilets and showers, the upgraded facilities will include the addition of hair & hand dryers, air source heat pumps for optimal temperature control, eco-friendly cubicle materials, convenient drinking fountains, energy-efficient lighting, and underfloor heating to keep you warm during the winter months.

    This of course does mean some disruption, but the refurbishment is vital and we hope everyone is understanding as these necessary upgrades take place. Hopefully we’ll be left with a more modern and comfortable pool that everyone can enjoy!